skip to main
|
skip to sidebar
Under Construction 24/7
Welcome to my blog!
Tuesday, January 12, 2010
Walker Project [ Re-assembled: Pan & Tilt ]
Only need one L connector then it is finished (for now).
Much better.
SSC-32 will get attached to the pan & tilt via an L connector too.
The overall balance should be much better compared to the previous assembly
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2011
(1)
►
April
(1)
▼
2010
(35)
►
September
(1)
►
March
(3)
►
February
(12)
▼
January
(19)
Brand new cable is on the way
Must be the cable
Connectivity issue is still there
Found a use for 6 Cell Li-MH battery.
I am still waiting
Broken solder joint somewhere
Walker Project [ Using C# to control ]
Walker Project [ First Test Run ]
Walker Project [ Ready to Launch ]
Epic fail
Finally!
Walker Project [ Re-assembled: Pan & Tilt ]
Walker Project [ Re-constructed: Ankle Joints ]
Waiting game is a terrible game
Draining Battery
No shipment
Walker Project [ Battery ]
Walker Project [ Parts List ]
Blog Started
About Me
Mr. Yang
Born and raised in Seoul, South Korea. Also a citizen of Canada, studying Electrical Engineering @ Lakehead University.
View my complete profile
No comments:
Post a Comment